Sr. No. |
Project
Name |
Client |
Site
location |
No. of test
bore |
Investigation
depth |
|
1 |
Bulk
Cement Terminal construction 1998 |
Sum
Cheong (Myanmar) Co., Ltd. Singapore |
Thilawa
Yangon Division |
8 Pts |
Total 360 meter |
|
2 |
Ye
River Railway Bridge1999 |
Myanma
Railways |
Mon
State |
9 Pts |
Total 209 meter |
|
3 |
Machinery FactorySuzuki Car Factory
- 1999 |
Kumagui
Gumi Co., Ltd. (Japan) |
S.
Dagon Industrial Zone |
2 Pts |
Total 51 meter |
|
4 |
MANI
Pharmaceutical raw material
Factory1999 |
Tokyo
Enterprise Co., Ltd. (Japan)
|
Hmawbe |
2 Pts |
Total 41 meter |
|
5 |
Donthami River Railway Bridge 1999 |
Myanma
Railways |
Mon
State |
8 Pts |
Total 231 meter |
|
6 |
Settlement study after reclamation
on the factory site2000 |
Kumagui
Gumi Co., Ltd. (Japan) |
S.
Dagon Industrial Zone |
Conti-nuous
level survey |
Software applied |
|
7 |
Soil Investigation on Approached
Bridge site2000 |
Myanma Railways |
Ye River Bridge Mon State |
2 Pts |
Total
61 meter |
|
8 |
Investigation of Bedrock extension
2000 |
Myanma
Railways |
Donthami Bridge Mon State |
1 Pts |
Total 20 meter |
|
9 |
Spinning Factory Construction
Project 2000 |
Shanghai World Best Co., Ltd. (China)
|
Mingalardon Industrial Park |
28 Pts |
Total 594 meter |
|
10 |
Study
on stability of Sub-structures of
existing bridge and prevention of
erosion due to river flow 2001 |
Myanma
Railways |
Myokwin
Bridge across Ngawin River,
Ayeyawaddy Division |
5 Pts |
Total 160 meter |
|
11 |
Ngaleik
Railway bridge 2001 |
Myanma
Railways |
Ngaleik
Chaung Pyinmana Township |
6 Pts |
Total 150 meter |
|
12 |
Foundation Study of future Myitnge
Railway bridge 2001 |
Myanma
Railways |
Myitnge
River, Kyaukse Township |
11 Pts |
Total 350 meter |
|
13 |
Geological Survey and bedrock
investigation project (Rock coring)
for bridge construction 2001 |
Myanma
Railways |
Vicinity of Pawnchaung Bridge site
on Nyaung Shwe - Namsam rail line |
17 Pts |
Total 308.7 meter |
|
14 |
Wind
Turbine Construction Project 2001 |
Newjec
Inc. (Japan) |
Chaungtha Beach |
1 Pts |
Total 20 meter |
|
15 |
Study
on improvement of Yangon City water
supply 2002 |
Tokyo
Engineering Consultant (Japan)
|
Hmawbi,
Hlaingthayar, Thaketa & South
Okkalapa |
6 Pts |
Total 170 meter |
|
16 |
Foundation investigation of housing
building 2002 |
Private
owner UOL |
Yankin |
1 Pts |
Total 35 meter |
|
17 |
Soil
Investigation for Factory site 2002 |
Asia
Optical Co., Ltd. Hongkong |
Mingaladon Industrial Park |
3 Pts |
Total 122.5 meter |
|
18 |
Soil
Investigation for heavy oil tank
construction 2002 |
Bintai
Kinden Corporation Bhd. (Singapore)
|
Hlainthayar Industrial zone |
1 Pts |
Total 30.5 meter |
|
19 |
Soil
Investigation for Japan Myanmar
Center Construction 2003 |
Pacific
Consultants Inc. (Japan) |
Kamayut
Township, Yangon |
2 Pts |
Total 30.5 meter |
|
20 |
Soil
Investigation for 25 Storey
Condominium Construction. 2003 |
Asia
World Co., Ltd. |
Hledan
Juncction Kamayut Township, Yangon |
6 Pts |
Total 300 meter |
|
21 |
Shwe
Pwya Kyi Condominium site (25
storey) 2003 |
Shwe
Than Lwin Co., Ltd. |
Merchant St. and Pansodan St.
Junction, Yangon |
4 Pts |
Total 225 meter |
|
22 |
Ngwe
Toe Pwya Condominiun site (25
Storey) 2003 |
Shwe
Than Lwin Co., Ltd. |
Along
46th Street between Mahabandoola and
Anawrahta Street, dawntown, Yangon |
6 Pts |
Total 308 meter |
|
23 |
Central
Area Development Project (25 Storey
buildings) 2003 |
Olympic
Construction Co., Ltd. |
Along
45th Street between Mahabandoola and
Anawrahta Street, downtown, Yangon |
6 Pts |
Total 300 meter |
|
24 |
Soil
Investigation for 5 Storey Dormitory
Building. (MIP D-3 Plot) 2003 |
Asia
Optical Co., Ltd. Hongkong |
Mingaladon Industrial Park |
4 Pts |
Total 140.6 meter |
|
25 |
Soil
Investigation for Nibban Industry
2004 |
Nibban
International Co., Ltd. |
East
Dagon Industrial City |
2 Pts |
Total 60 meter |
|
26 |
Soil
Investigation for Japanese school
construction , 2004 |
Japanese School Committee |
Dagon
Township, Yangon |
1 Pts |
Total 30 meter |
|
27 |
Swedish
Sounding test 2005 |
Nibban
International Co., Ltd. |
Thaketa
Industrial Zone Yangon |
3 Pts |
|
|
28 |
Concrete core sampling for testing
2006 |
High
Tech Concrete Co., Ltd. |
Lamadaw
T/S Yangon |
3 Pts |
|
|
29 |
Soil
Investigation for factory
Construction 2006 |
Ministry of Industry II |
Bago
Division |
30 Pts |
Total 229 meter |
|
30 |
Soil
Investigation for factory
construction 2006 |
Ministry of Industry II |
Taungdwingyi |
7 Pts |
Total 71 meter |
|
31 |
Soil
Investigation for construction of
LNG Plant |
Daewoo
International Corporation (Myanmar
E&P) |
Rakhine
State |
9 Pts |
Total 137.5 meter |
|
32 |
Soil
investigation for onshore pipeline
route
2008 |
Daewoo International Corporation
(Myanmar E&P) |
Near Kyauk Phyu, Rakhine State |
25 Pts |
70.3 meter along 4.7 Km |
|
33 |
Soil
investigation for Onshore pipeline
project (Landfall and Onshore Gas
Terminal area) 2008 |
Daewoo International Corporation
(Myanmar E&P) |
Near Kyauk Phyu, Rakhine State |
30 Pts |
449.4 meter by machine boring and
test pits |
|
34 |
Soil
investigation for the study on
Possibility of Liquefaction in sub
soil layer in the compound of
Embassy of Federal Republic of
Germany 2008 |
Embassy
of Federal Republic of Germany |
Embassy
of Federal Republic of
Germany, Yangon |
3
Pts |
Total 64 meter |
|
35 |
Soil
investigation for Mingalar Bridge
Construction 2008
|
Grassroots Grant Assistant Scheme
|
Mon
State |
2
Pts |
Total 60 meter |
|
36 |
Soil
investigation for 230 KVA
Transmission Line Chindwin River
Crossing Project 2009 |
Golden
Tri Star |
Nyaung
Bin Gyi Village,Monywa Township |
2
Pts |
Total 120 meter |
|
37 |
Soil
investigation for School cum Cyclone
Shelter Project 2009 |
Japan
International Cooperation Agency
JICA Study Team |
Bogale
& Labutta Township |
21 Pts |
Total 630 meter |
|
38 |
Soil
investigation for Onshore Supply
Base 2009 |
Daewoo International Corporation
(Myanmar E&P) |
Near Kyauk Phyu, Rakhine State |
11 Pts |
Total 335 meter |