1. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (2
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(9)
buildings by different type
of foundation design. |
Construction
method |
Two
Storeyed RCC Building with 8
Bore Pile & 1 Strip Footing
Foundation. |
|
2. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (3
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(3)
buildings by different type
of foundation design |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile & 2 strip footing
foundation. |
|
3. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (4
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(3)
buildings by different type
of foundation design |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile & 2 strip footing
foundation. |
|
4. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (5
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(1)
building by bole pile
foundation design. |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile foundation. |
|
5. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (6
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(1)
building by strip footing
foundation design. |
Construction
method |
Two
Storeyed RCC Building with 1
strip footing foundation. |
|
6. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (7
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(1)
building by pile foundation
design. |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile foundation. |
|
7. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (8
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(1)
building by pile foundation
design. |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile foundation. |
|
8. |
Project |
Design, Drawing and
Specification (Consultant
works) of Primary School Cum
Cyclone Shelter in the Area
Affected by Cyclone Nargis
in Ayeyarwaddy Division in
the Union of Myanmar. (12
Classroom type) |
 |
|
Year |
2009 |
|
Client |
Japan
International Cooperation
Agency (JICA Study Team). |
No. of
building |
(1)
building by pile foundation
design. |
Construction
method |
Two
Storeyed RCC Building with 1
bore pile foundation. |
|
9. |
Project |
Design
and construction of Mingalar
bridge in Tha Hton Township,
Mon State. |
 |
|
Year |
2008 |
|
Client |
Bridge
Construction Committee under
the aggrement of Embassy of
Japan. |
No. of
building |
(1
Nos.)80ft(20+40+20) span. |
Construction
method |
RCC
bridge with RC pile
foundation, steel girder
with hard wood deching. |